Keystone Bridge-Update

The Elkader City Council was hoping to get an update on the Keystone Bridge for a meeting on Monday, but that is now cancelled. The engineer does not have the information needed for the special meeting. The contractor continues work on finding a company to design the shoring, and the shoring needs to be designed before a cost estimate and timeline for repair can be put together.

261 views